Dry Air & Depronage Tunnel Validation

Dry Air & Depronage Tunnel Validation

OQ and PQ studies of deprojectnization and sterilization tunnels are carried out.

  • The following steps are being followed for stability validation work;
  • Preparation of the validation protocol, which includes the details and objectives of the work to be done,
  • Verification of reference termokupl before and after the procedure,
  • Empty working temperature distribution test,
  • Heat penetration test, loaded,
  • The preparation of the validation report tells the whole process along with the results.